Electronic Shifter FPC
This electronic shifter FPC is designed for automotive electronic gear shift systems. Hongyi Precision applies proven bend radius control expertise, distinguishing between dynamic and static bend zones: minimum bend radius in dynamically recurring bend areas ≥10–20× FPC substrate thickness; minimum bend radius in statically formed, one-time bend areas ≥6–10× substrate thickness. Standardized radius control prevents copper foil from enduring extreme deformation over time, reducing trace fracture failure risk at the source. Key Features

Key features
Dynamic/Static Bend Zone Control
Differentiated Minimum Bend Radius Standards for Dynamic and Static Bend Areas
Prevents Copper Foil Fatigue Fracture
Standardized Bend Curvature to Avoid Long-Term Extreme Deformation
Compatible with Continuous Rotational Applications
Meets High-Frequency Reciprocating Rotation Requirements of Electronic Shifters
High-Toughness PI Substrate
Temperature Resistant (High/Low), Anti-Reciprocating Bend
Mature Automotive-Grade Manufacturing Process
Meets Reliability Requirements for Automotive Components
100% Electrical Continuity Testing
Strict Control of Batch-to-Batch Quality Consistency
Specifications
- Layers
- 1–2 Layers
- Minimum Bend Radius in Dynamic Bend Zone
- ≥10–20× Substrate Thickness
- Minimum Bend Radius in Static Formed Bend Zone
- ≥6–10× Substrate Thickness
- Substrate
- PI 12.5μm / 25μm
- Copper Thickness
- 12μm, 18μm
- Surface Finish
- ENIG Gold Plating, OSP
- Operating Temperature
- -40℃ ~ 105℃
- Electrical Testing
- 100% Full Inspection
Typical applications
- Automotive Electronic Shifter Position Sensor
- In-Vehicle Rotary Angle Sensing Module
- Soft Board Assembly for Electronic Gear Position Signal Acquisition
Talk to an engineer
Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.
Quote NowRelated products

Electronic gear shifter, shift-selector FPC
Electronic Gear Shifter FPC
Integrated automotive electronic gear shifter FPC with built-in conductive ring, designed for gear-position angle signal acquisition.
View details
Sensor Interconnection
Wiper Control Switch FPC
Wiper Control Switch FPC: CAN/LIN differential signal traces follow equal-length, equal-spacing, parallel routing guidelines to maintain continuous impedance and ensure stable in-vehicle bus signal transmission.
View details
Sensor interconnection
Electronic gear shifter rolled copper FPC
Automotive electronic gear shifter sensor flexible circuit board; high-elongation rolled annealed (RA) copper foil is used in dynamic flex zones to withstand millions of reciprocating bends, solving long-term cracking and open-circuit failures.
View details