Capabilities

Process parameters and manufacturing capability

The figures below reflect our production-proven capability window. For special structures, please talk to our engineering team for a detailed assessment.

Process capability

The specifications below are validated in volume production. Special structures beyond this range require engineering review to confirm lead time and yield.

01

Circuitry & precision

Min. line width / spacing
0.035 mm / 0.035 mm
Min. hole diameter
0.05 mm
Impedance control
± 10%
Outline tolerance
± 0.10 mm (down to ± 0.05 mm)

02

Materials & structure

Coverlay thickness
7.5 µm / 12.5 µm / 25 µm
Copper thickness
12 µm / 18 µm / 35 µm
Flex layer count
1 – 4 layers (up to 6)
Stiffener options
PI / FR-4 / steel / aluminium

03

Reliability & delivery

Bending cycles
> 1,000,000 cycles
Operating temperature
-40 °C to +125 °C
Surface finish
OSP / ENIG / tin plating
Lead time
Samples 3 – 4 days, volume 7 – 8 days

Material system

Long-standing relationships with leading material suppliers cover the full range needed for automotive and robotics applications.

01

Polyimide (PI)

12.5 / 25 / 50 µm options, the preferred base material for automotive flex.

02

RA rolled copper

Excellent grain ductility, preferred for dynamic flex and dexterous hand applications.

03

ED electrolytic copper

A clear cost advantage, suited to static bending and high-volume programmes.

04

Weather-resistant coverlay

Improves humidity and weather resistance for exposed applications such as wipers.

05

Stiffener materials

PI, FR-4, steel and aluminium stiffeners to meet assembly and thermal needs.

06

Shielding and thermal films

Shielding film and heat-spreading layers address EMI and temperature rise.

Smart Manufacturing

Smart manufacturing, proven strength

Modern production lines driving efficiency and precision.

  • Automated flexible circuit production line equipment

    Automated production, higher efficiency

    Automated Production

    Fully introducing high-precision automated equipment and robotic arms, improving production efficiency by over 30% while ensuring high consistency and stability.

  • In-line inspection and micron-level parameter monitoring

    Precision manufacturing, strict control

    Precision Manufacturing

    Strictly following ISO international standards with advanced in-line inspection systems, monitoring micron-level parameters in real time to ensure a 99.9%+ yield rate.

  • Dongguan i-FPC Circuit manufacturing base

    Scaled capacity, fast delivery

    Scaled Capacity

    Class-10,000 cleanroom with multiple parallel production lines, offering strong flexible manufacturing capability for rapid order switching and scaled delivery.

Key equipment and lines

100%
Electrical test coverage
AOI
Automated optical inspection
FPCA
Flex assembly capability
3-4
Day rapid prototyping
Automated flexible circuit production line
Engineers reviewing a flexible circuit design

Engineering and co-design

Our R&D team is made up of engineers with more than ten years in flexible circuits, providing cost-effective solutions across differing product requirements, manufacturing constraints and quality targets.

  • DFM analysis

    We review drawings and specifications to head off volume production risk and wasted cost.

  • Structure and stack-up design

    Joint sign-off on bend areas, stiffeners and routing to lift assembly yield.

  • Fault diagnosis support

    One-to-one troubleshooting and technical guidance to reduce production losses.

  • Continuous improvement

    Batch-by-batch review of yield and exceptions to keep refining process parameters.

3-4days

Sample lead time

7-8days

Production lead time

10yrs+

Engineering experience

15million pcs

Monthly flexible circuit capacity

Send us your drawings

Talk to an engineer