Quality and certification

Quality built to pass the toughest qualification

Hongyi Precision is certified to ISO 9001, ISO 14001 and IATF 16949, with a quality system spanning design, manufacturing and delivery.

100%

Electrical test coverage

3

International certifications

AOI

Automated optical inspection

24h

Issue response commitment

Quality Control

Quality control and a professional team

A rigorous full-process quality inspection system combined with a continuously growing professional talent team provides dual assurance for product quality and enterprise development.

  • Standardised laboratory with high-precision testing equipment

    Rigorous inspection, source control

    Rigorous Inspection

    Equipped with standardised laboratories and high-precision testing equipment, implementing a one-vote veto system from raw material intake to finished product delivery, ensuring all products meet international standards.

  • Technical seminar and quality awareness training session

    Professional empowerment, everyone advancing

    Professional Empowerment

    Establishing a regular theory plus practice training mechanism, conducting industry technical seminars and quality awareness campaigns, building a highly efficient team with both professional skill and quality literacy.

  • Process data analysis and precision test equipment

    Striving for excellence in every detail

    Continuous Improvement

    Customer-oriented, continuously breaking through quality bottlenecks through data analysis and process iteration, striving for excellence in every detail and setting new industry quality standards.

Certifications

A complete set of international certifications covering quality management, the automotive sector and environmental management.

  • ISO 9001:2015 Quality management system

    01

    ISO 9001:2015

    Quality management system

  • ISO 14001:2015 Environmental management system

    02

    ISO 14001:2015

    Environmental management system

  • IATF 16949:2016 Automotive quality management system

    03

    IATF 16949:2016

    Automotive quality management system

Laboratory capability

01

Temperature endurance

High and low temperature cycling and thermal shock testing to verify automotive temperature capability.

02

Flex life testing

Dynamic and static bend testing to verify durability for column switch and dexterous hand duty.

03

Conductive stability

Resistance consistency and contact resistance measurement to protect stable signal transmission.

04

Electrical testing

100 % electrical testing on finished parts plus dielectric withstand and insulation resistance measurement.

05

Appearance and dimensions

AOI combined with full dimensional inspection to control outline tolerance.

06

Incoming and ageing validation

Incoming material screening and reliability ageing trials on finished parts.

Inspection work in the reliability laboratory

Quality control flow

  1. 01

    Incoming inspection (IQC)

    Incoming material screening with batch traceability and periodic supplier audits.

  2. 02

    In-process inspection (IPQC)

    Key process parameters monitored so exceptions are caught and traced promptly.

  3. 03

    Final inspection (FQC)

    100 % electrical testing and AOI, with full appearance and dimensional inspection.

  4. 04

    Outgoing audit (OQA)

    Sampling confirmation with test reports and traceability records issued.

Send us your drawings

Contact us