Applications
Built for two demanding sectors: automotive and humanoid robotics
Every application sets its own reliability bar. We build the process to clear it first time.

01
Automotive electronics
Flexible printed circuits bring light weight, high flex endurance, dense integration and resistance to temperature extremes and vibration, allowing them to replace conventional wiring harnesses across EV powertrain, smart cockpit and body control components. Backed by our IATF 16949 system and automotive process controls, we deliver stable volume production for column switches, electronic shifters, wiper systems and switch assemblies.
Key points
IATF 16949 system
Automotive process control with complete quality documentation.
Replaces wiring harnesses
Integrated routing cuts connectors and solder joints, raising overall reliability.
Thermal and vibration validation
Thermal cycling, vibration and conductive stability testing to automotive requirements.
Recommended products

02
Humanoid robotics
Industrial delivery of humanoid robots has accelerated recently, and the market for dedicated high-reliability FPC is growing quickly with it. A single humanoid robot uses 40-70 flexible circuits across joint drives, tactile dexterous hands and vision modules. We concentrate on two of the most demanding categories, dexterous hand tactile sensing and coreless motor flex, with fast iteration support from prototype through to volume.
Key points
High-density tactile sensing
Dense sensing nodes in a minimal footprint raise tactile resolution.
Very high dynamic flex life
Dedicated knuckle bend design extends dexterous hand service life.
Fast iteration support
Samples in 3-4 days to match the rapid design cycles of robotics customers.
Recommended products

03
Sensors and actuators
Sensor signals are low level and vulnerable to interference, while actuators must survive repeated motion and carry drive current. Using ground meshes, optional shielding layers and heavier copper, we balance weak-signal integrity against high current capability on a single flex circuit, with 100 % electrical testing to secure batch consistency.
Key points
Weak-signal immunity
Ground mesh and shielding schemes suppress EMI crosstalk.
Signal and drive in one
Feedback signals and drive current combine into a single flex circuit.
Batch consistency
100 % electrical testing and resistance consistency screening on finished parts.

04
AI vision and interconnect
For automotive cameras, robotic vision modules and AI inference units we supply dense, fine-line flex that balances routing density, impedance consistency and bend assembly needs, helping customers complete high-speed signal interconnect inside compact modules.
Key points
Dense fine lines
Fine line widths meet the dense routing needs of vision modules.
Impedance consistency
Routing and stack-up designed together to protect high-speed signal integrity.
Bend-friendly assembly
A flexible structure suits folded, compact in-module assembly.