FPC for Module Touch Interaction Components
Dongguan Hongyi Precision Circuit Co., Ltd. specializes in R&D and manufacturing of intelligent cockpit FPCs, with extensive expertise in automotive-grade flexible printed circuits. Strictly adhering to the IATF 16949 automotive quality management standard, Hongyi Precision delivers customized high-durability, high-stability FPC solutions for central control displays, instrument clusters, interior ambient lighting, and gear shifters—enabling automakers to build premium intelligent cockpits featuring lightweight design, curved integration, and high-definition signal transmission.

Key features
Bend-resistant
High-toughness PI polyimide substrate
Easy assembly
Ultra-thin stack-up design
Multiple design options
Customizable single- or double-layer structure
Ultra-flexible
3D spatial routing and conformal curved-surface mounting
Specifications
- Number of layers
- 1–2 layers
- Minimum trace/space
- 50/50 µm
- Base material
- PI 25/20 µm
- Copper thickness
- 12/18 µm
- Coverlay
- Weather-resistant PI coverlay
- Surface finish
- ENIG, gold plating
- Outline tolerance
- ±0.050 mm
- Operating temperature
- –40°C to 105°C
Typical applications
- Central control display
- Touchscreen
- In-cabin rear-seat streaming video
- Instrument cluster display
Talk to an engineer
Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.
Quote NowRelated products

Smart Cockpit FPC
Central Control and Instrument Display FPC
Central control and instrument display FPC enables signal transmission between smart cockpit central units and instrument clusters, supporting single-layer, multi-layer, and custom-shaped cut structures to meet OEM cockpit structural design and assembly stroke requirements.
View details
Smart Cockpit FPC
Seat Pressure Sensor FPC
The seat pressure sensor FPC is used in smart cockpit systems to monitor occupant posture and pressure distribution in real time. It features an automotive-grade flexible printed circuit structure validated through one million flex cycles, thermal cycling (high/low temperature), vibration, and salt spray testing—ensuring high reliability and full traceability.
View details
Smart Cockpit FPC
Central Control Display Touch Module FPC
The Central Control Display Touch Module FPC is used in smart cockpit in-vehicle display systems, featuring rolled annealed copper foil and automotive-grade conformal coating; supports one million dynamic flex cycles and operates across a wide temperature range of -40°C to 125°C, meeting assembly requirements for irregular shapes and narrow-bezel large displays.
View details