Central Control Display Touch Module FPC

Hongyi Precision mass-produces smart cockpit automotive FPCs, addressing industry challenges including high-frequency bending, thermal cycling, and vehicle vibration. Utilizing high-precision rolled annealed copper foil and automotive-specific conformal coating, the product withstands one million dynamic flex cycles and operates reliably from -40°C to 125°C—ideal for irregular structural layouts and narrow-bezel large displays in smart cockpits.

Central Control Display Touch Module FPC

Key features

Mature Design

Optional shielding layer for electromagnetic interference (EMI) suppression, reducing touch drift and false touches;

Reliable Quality

Excellent temperature and humidity resistance, plus superior flex life;

Compact Layout

Ultra-thin flexible PI substrate enables irregular routing and curved-surface bonding;

Stable Signal Transmission

Precision micro-traces ensure consistent impedance and preserve touch signal integrity;

Specifications

Layers
1–2
Minimum Line Width/Spacing
50/50 µm
Base Material
PI 25/50 µm
Copper Thickness
35/18 µm
Stiffener Options
PI or stainless steel stiffener
Outline Tolerance
±0.10 mm
Operating Temperature
-40°C to 105°C

Typical applications

  • Central Control Display
  • Central Control Touch Buttons
  • In-Vehicle Streaming Media Display
  • In-Facility Ceiling-Mounted Display
  • In-Vehicle Rearview Mirror
  • Rear-Seat Central Control Display

Talk to an engineer

Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.

Quote Now

Related reading

Technical Insights

What Information Is Required for Starry Sky Roof FPC Customization?

Providing only roof length, width, and LED count is insufficient when requesting quotes for starry sky roof FPC customization. Roof curvature, sunroof location, panel joining method, LED coordinates, power distribution zones, connectors, and assembly processes all impact design. This article presents a ready-to-use customer requirements checklist.

Learn more
Technical Insight

How Automotive Starry-Sky Roof FPC Manufacturers Control Large-Format Mass-Production Yield: Five Critical Control Gates

Automotive starry-sky roof FPCs feature large surface areas, long trace runs, and high LED point counts—minor deviations on a single panel can be magnified during panel拼接 and vehicle installation. This article outlines how manufacturers control mass-production yield for large-format starry-sky roof FPCs through five critical gates: drawing review, lamination, imaging/etching, profile handling & transfer, and powered assembly validation.

Learn more
Technical Insight

How Do Automotive Starry-Sky Roof FPCs Balance Large Dimensions with Assemblability? From Splicing Reference Points to Power Supply Zoning

Automotive starry-sky roof FPCs feature large surface areas and high LED point counts, often requiring segmented splicing per vehicle model. Stable assembly depends not only on dimensional accuracy but also on positioning reference points, power supply zoning, splicing interfaces, and substrate flatness. This article outlines assemblable design methodologies for large-format starry-sky roof FPCs from the joint perspective of structural and procurement engineers.

Learn more