Products
A full range of automotive and robotics FPC
Custom FPC / FPCA for automotive switches, sensors and humanoid robot hands.
Browse products by application
21 products

Electronic gear shifter, shift-selector FPC
Electronic Gear Shifter FPC
Integrated automotive electronic gear shifter FPC with built-in conductive ring, designed for gear-position angle signal acquisition.
View details
Automotive Switch Interconnection
Automotive Column-Mounted Shifter FPC
Automotive shifter flexible circuit board with high-temperature-resistant PI coverlay, balancing flexural durability and tensile strength.
View details
Sensor Interconnection
Electronic Shift Sensor FPC
Automotive electronic shift position sensing FPC, with optimized trace routing in bending zones to eliminate stress concentration points and significantly extend repeated flex life.
View details
Sensor Connection
Electronic Shifter FPC
Flexible Printed Circuit for automotive electronic shifter mechanisms, featuring dynamic/static bend zone control to manage bend radius and prevent copper foil fatigue fracture, suitable for long-term reciprocating rotational applications.
View details
Sensor Interconnection
Wiper Control Switch FPC
Wiper Control Switch FPC: CAN/LIN differential signal traces follow equal-length, equal-spacing, parallel routing guidelines to maintain continuous impedance and ensure stable in-vehicle bus signal transmission.
View details
Sensor interconnection
Electronic gear shifter rolled copper FPC
Automotive electronic gear shifter sensor flexible circuit board; high-elongation rolled annealed (RA) copper foil is used in dynamic flex zones to withstand millions of reciprocating bends, solving long-term cracking and open-circuit failures.
View details
Bipedal Robot
Bipedal Robot Joint Sensor FPC
Bipedal robot joint flexible printed circuit (FPC), with zone-specific surface finishes: ENIG for functional pads and tin plating for general traces. ENIG pads enhance salt mist resistance and oxidation resistance, balancing long-term operational reliability and manufacturing cost.
View details
Humanoid Robot
Humanoid Robot Rigid-Flex FPC
Humanoid robot rigid-flex FPC: precisely designed mounting holes and alignment features in static areas ensure reliable assembly positioning and resistance to long-term vibration, preventing FPC misalignment and stress-induced aging.
View details
Bipedal Robot
Bipedal Robot Camera Module FPC
Flexible Printed Circuit for bipedal robot vision cameras: Early-stage DFM design strictly aligns with production process limits; standardized solder mask openings and via spacing parameters effectively reduce process defects and ensure stable high-volume delivery.
View details
Smart Cockpit FPC
Central Control Display Touch Module FPC
The Central Control Display Touch Module FPC is used in smart cockpit in-vehicle display systems, featuring rolled annealed copper foil and automotive-grade conformal coating; supports one million dynamic flex cycles and operates across a wide temperature range of -40°C to 125°C, meeting assembly requirements for irregular shapes and narrow-bezel large displays.
View details
Smart Cockpit FPC
Automotive Display FPC
Automotive Display FPC is specifically designed for smart cockpit display systems, manufactured to AEC-Q200 standards, and engineered to resist bending-induced cracking, trace oxidation, and solder joint lifting.
View details
Consumer Electronics FPC
Smart Lock Keypad FPC
Smart lock keypad FPC for touch-key signal transmission in smart locks; features flexible substrate and precision circuitry to meet panel space constraints and bending installation requirements.
View detailsSend us your drawings
Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.