Products

A full range of automotive and robotics FPC

Custom FPC / FPCA for automotive switches, sensors and humanoid robot hands.

Browse products by application

Smart Wearable Mainboard FPC

Consumer-Grade FPC

Smart Wearable Mainboard FPC

Smart wearable mainboard FPC is a consumer-grade flexible printed circuit, suitable for miniaturized and irregularly shaped electronics such as smart wearables, Bluetooth earphones, and tablets, featuring ultra-thin construction, bendability, and 3D conformal mounting.

View details
LED Phototherapy Facial Mask FPC

Consumer Electronics FPC

LED Phototherapy Facial Mask FPC

LED phototherapy facial mask FPC for sensor interconnection in flexible LED light therapy masks; uses rolled annealed copper substrate and LDI precision imaging to ensure uniform multi-channel LED current and consistent luminance; supports 3D curved surface conformability, repeated bending, and ENIG pads compatible with SMT reflow soldering.

View details
Tactile Switch FPC

Consumer Electronics FPC

Tactile Switch FPC

Tactile Switch FPC belongs to the sensor interconnection category of flexible printed circuits, specifically designed for touch-key signal transmission in consumer electronics—suitable for wearables, audio devices, smart home products, and touch modules; customized per end-product bending frequency and assembly method.

View details
Custom 0.15/0.2mm Ultra-Thin FR4 PCB

Consumer Electronics FPC

Custom 0.15/0.2mm Ultra-Thin FR4 PCB

Ultra-thin 0.15mm/0.2mm FR4 rigid PCBs engineered specifically for consumer electronics FPC applications, manufactured on dedicated thin-board production lines to resolve lamination warpage challenges; supports high-Tg substrates and IATF 16949 automotive qualification, suitable for automotive electronics and intelligent modules.

View details
FPC for Module Touch Interaction Components

FPC for Intelligent Cockpit

FPC for Module Touch Interaction Components

FPC for Module Touch Interaction Components is specifically designed for automotive central control displays, instrument clusters, interior ambient lighting, and gear shifters—core intelligent cockpit components—with automotive-grade design for high durability and stability, supporting lightweight construction, curved layout, and high-definition signal transmission.

View details
Central Control and Instrument Display FPC

Smart Cockpit FPC

Central Control and Instrument Display FPC

Central control and instrument display FPC enables signal transmission between smart cockpit central units and instrument clusters, supporting single-layer, multi-layer, and custom-shaped cut structures to meet OEM cockpit structural design and assembly stroke requirements.

View details
Seat Pressure Sensor FPC

Smart Cockpit FPC

Seat Pressure Sensor FPC

The seat pressure sensor FPC is used in smart cockpit systems to monitor occupant posture and pressure distribution in real time. It features an automotive-grade flexible printed circuit structure validated through one million flex cycles, thermal cycling (high/low temperature), vibration, and salt spray testing—ensuring high reliability and full traceability.

View details
Dexterous hand sensing FPC

Humanoid robotics

Dexterous hand sensing FPC

High-density tactile sensing flex that determines the feel and service life of a dexterous hand.

View details
Cup Motor FPC

Humanoid Robot FPC

Cup Motor FPC

Precision flexible interconnects for cup motors and joint actuators.

View details

Send us your drawings

Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.

Quote Now