Tactile Switch FPC
Specializing in consumer electronics sub-segments, Dongguan Hongyi Precision focuses on FPCs for wearables, audio devices, smart home products, and touch modules—delivering differentiated designs based on end-product operating conditions, bending frequency, and assembly methods to precisely meet application-specific requirements.

Key features
Extended Lifespan
Over 500,000 actuations per key
Crisp Tactile Feedback
260 g/keystroke actuation force with crisp response
Compact Layout
Ultra-thin flexible PI substrate enables irregular routing and conformal surface mounting.
Stable Signal Transmission
Precision fine-line circuitry ensures consistent impedance and preserves touch signal integrity.
Specifications
- Layer Count
- 1–2 layers
- Minimum Trace/Space
- 50 / 50 µm
- Base Material
- PI 25 / 50 µm
- Copper Thickness
- 35 / 18 µm
- Stiffener Options
- PI or stainless-steel stiffeners
- Outline Tolerance
- ±0.10 mm
- Operating Temperature
- −40°C to +105°C
Typical applications
- Volume Control
- Power On/Off Control
- Panel Button Control
- Various Switch Button Controls
Talk to an engineer
Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.
Quote NowRelated products

Consumer Electronics FPC
Custom 0.15/0.2mm Ultra-Thin FR4 PCB
Ultra-thin 0.15mm/0.2mm FR4 rigid PCBs engineered specifically for consumer electronics FPC applications, manufactured on dedicated thin-board production lines to resolve lamination warpage challenges; supports high-Tg substrates and IATF 16949 automotive qualification, suitable for automotive electronics and intelligent modules.
View details
Consumer Electronics FPC
Smart Lock Keypad FPC
Smart lock keypad FPC for touch-key signal transmission in smart locks; features flexible substrate and precision circuitry to meet panel space constraints and bending installation requirements.
View details
Consumer Electronics FPC
LED Phototherapy Facial Mask FPC
LED phototherapy facial mask FPC for sensor interconnection in flexible LED light therapy masks; uses rolled annealed copper substrate and LDI precision imaging to ensure uniform multi-channel LED current and consistent luminance; supports 3D curved surface conformability, repeated bending, and ENIG pads compatible with SMT reflow soldering.
View details