Smart Lock Keypad FPC
Dongguan Hongyi Precision Circuit Co., Ltd. specializes in R&D and mass production of consumer electronics FPCs, serving as a professional source manufacturer of flexible printed circuits. Leveraging a mature precision manufacturing system, the company focuses on custom FPC production for consumer electronics, delivering stable quality, precision fabrication, and efficient turnaround to provide one-stop FPC solutions for digital devices, smart wearables, home appliances, and related industries.

Key features
Mature design
Optional shielding layer for EMI suppression, reducing touch drift and false triggering;
Reliable quality
Excellent temperature and humidity resistance; high flex-life performance;
Compact layout
Ultra-thin flexible PI substrate enabling irregular routing and conformal mounting on curved surfaces;
Stable transmission
Precision fine-pitch traces with controlled impedance to ensure touch signal integrity;
Specifications
- Layers
- 1 – 2
- Minimum trace/space
- 50 / 50 µm
- Base material
- PI 25 / 50 µm
- Copper thickness
- 35 / 18 µm
- Stiffener options
- PI / stainless steel stiffener
- Outline tolerance
- ± 0.10 mm
- Operating temperature
- -40℃ ~ 105℃
Typical applications
- Smart lock touch key
- Mobile phone keypad
- Industrial control keypad
- Handheld PAD keypad
Talk to an engineer
Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.
Quote NowRelated products

Consumer Electronics FPC
LED Phototherapy Facial Mask FPC
LED phototherapy facial mask FPC for sensor interconnection in flexible LED light therapy masks; uses rolled annealed copper substrate and LDI precision imaging to ensure uniform multi-channel LED current and consistent luminance; supports 3D curved surface conformability, repeated bending, and ENIG pads compatible with SMT reflow soldering.
View details
Consumer Electronics FPC
Tactile Switch FPC
Tactile Switch FPC belongs to the sensor interconnection category of flexible printed circuits, specifically designed for touch-key signal transmission in consumer electronics—suitable for wearables, audio devices, smart home products, and touch modules; customized per end-product bending frequency and assembly method.
View details
Consumer Electronics FPC
Custom 0.15/0.2mm Ultra-Thin FR4 PCB
Ultra-thin 0.15mm/0.2mm FR4 rigid PCBs engineered specifically for consumer electronics FPC applications, manufactured on dedicated thin-board production lines to resolve lamination warpage challenges; supports high-Tg substrates and IATF 16949 automotive qualification, suitable for automotive electronics and intelligent modules.
View details