LED Phototherapy Facial Mask FPC
Hongyi Precision Photon Facial Mask FPC, developed specifically for flexible LED phototherapy facial masks, features high-ductility rolled annealed copper flexible substrate, LDI precision imaging, and balanced etching to ensure uniform multi-channel LED current and excellent luminance consistency; ENIG pad finish enables reliable SMT reflow soldering and prevents cold solder joints or LED failure. Circuit layout optimized for mechanical stress relief, enabling conformal fit to 3D facial contours and repeated wear-induced bending; vacuum-laminated coverlay provides insulation and moisture resistance; laser-cut custom shapes match silicone mask encapsulation. Available in single-layer or double-layer configurations; outline, stiffener, and pad layout customized per requirement to meet mass production needs of various photorejuvenation masks.

Key features
Precision Design
Refined Substrate Selection and Pre-treatment Process
Advanced Manufacturing
LDI Laser Direct Imaging + Balanced Etching Process
Targeted R&D
LED Pad-Specific Reinforcement Process
Built for Reliability
Zoned Stiffening and Custom Laser Shaping Process
Consistent Quality
100% Electrical Reliability Testing Across Full Process Flow
Specifications
- Layers
- 1–2 Layers
- Minimum Line Width/Spacing
- 50/50 µm
- Substrate
- PI 25/50 µm
- Copper Thickness
- 35/18 µm
- Stiffener Options
- PI or Stainless Steel Stiffener
- Outline Tolerance
- ±0.10 mm
- Operating Temperature
- –40°C to 105°C
Typical applications
- Photon Facial Mask
- Red Light Facial Mask
- Beauty Facial Mask
- Laser Hair Removal Device
- Evaporation Cap
Talk to an engineer
Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.
Quote NowRelated products

Consumer Electronics FPC
Tactile Switch FPC
Tactile Switch FPC belongs to the sensor interconnection category of flexible printed circuits, specifically designed for touch-key signal transmission in consumer electronics—suitable for wearables, audio devices, smart home products, and touch modules; customized per end-product bending frequency and assembly method.
View details
Consumer Electronics FPC
Custom 0.15/0.2mm Ultra-Thin FR4 PCB
Ultra-thin 0.15mm/0.2mm FR4 rigid PCBs engineered specifically for consumer electronics FPC applications, manufactured on dedicated thin-board production lines to resolve lamination warpage challenges; supports high-Tg substrates and IATF 16949 automotive qualification, suitable for automotive electronics and intelligent modules.
View details
Consumer Electronics FPC
Smart Lock Keypad FPC
Smart lock keypad FPC for touch-key signal transmission in smart locks; features flexible substrate and precision circuitry to meet panel space constraints and bending installation requirements.
View details