Custom 0.15/0.2mm Ultra-Thin FR4 PCB

Specialized in 0.15mm and 0.2mm ultra-thin FR4 rigid PCB production, overcoming thin-board lamination warpage via dedicated thin-board production lines. High-Tg substrates available; IATF 16949 automotive qualification supported. Widely applied in automotive electronics and intelligent modules. Engineering pre-assessment supported, with prototyping, low-to-medium volume, and high-volume production delivery.

Custom 0.15/0.2mm Ultra-Thin FR4 PCB

Key features

Ultra-Thin Finished Thickness

Supports finished thicknesses down to 0.15mm (ultra-limit thin board) and 0.2mm ultra-thin FR4 rigid boards, optimized for space-constrained miniature module designs.

Warpage-Specific Control

Employs vacuum lamination, thin-board-specific fixtures, and optimized stack-up design to effectively reduce warpage after lamination and reflow soldering, meeting SMT continuous placement requirements.

High-Reliability Substrate Options

Standard FR4 or high-Tg FR4 (TG ≥170°C), offering strong thermal shock resistance for high-temperature automotive environments.

Automotive-Grade Quality Capability

Production controlled per IATF 16949 requirements, with full traceability across incoming materials, process steps, and reliability testing—targeted for high-end applications including automotive electronics and AI intelligent modules.

Fine-Line Capability

LDI direct imaging enables fine line width/spacing; supports blind/buried via HDI stack-up design.

End-to-End Delivery

Supports early-stage engineering stack-up evaluation, prototyping, low-to-medium volume, and stable high-volume production—with proactive thin-board risk assessment.

Specifications

Layer Count
1–2 layers (0.15mm layer count subject to stack-up evaluation)
Finished Board Thickness
0.15mm / 0.2mm
Copper Foil Thickness
12μm / 18μm / 25μm options available
Base Material
FR-4; high-Tg options: TG170°C / TG180°C
Minimum Line Width / Spacing
Standard 0.05mm (LDI process; subject to board thickness and layer evaluation)
Minimum Drilled Hole Diameter
Mechanical drill ≥0.15mm; laser blind vias ≥0.08mm (HDI)

Typical applications

  • Automotive Electronics
  • AI Robot Modules
  • Miniature Sensors
  • Slim Industrial Control Modules

Talk to an engineer

Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.

Quote Now

Related reading

Technical Insight

How Do 0.15mm Ultra-Thin PCB Manufacturers Make Stack-Up Trade-Offs? Thickness, Impedance, and Assembly Strength Cannot All Be Maximized Simultaneously

Designing a 0.15mm ultra-thin PCB is not about pushing every parameter to its limit—it’s about balancing total thickness, layer count, copper thickness, impedance control, via structure, and assembly strength. This article explains how to determine a manufacturable stack-up for 0.15mm thin boards using an engineering decision-making approach.

Learn more
Technical Insights

How Ultra-Thin PCB Manufacturers Address SMT Warpage: Production-Ready Methods from Stackup Balancing to Reflow Fixturing

When ultra-thin PCBs enter SMT, warpage, insufficient stencil contact, unstable solder paste transfer, and reflow-induced deformation often occur simultaneously. This article outlines mass-production control methods for ultra-thin PCBs—from stackup and copper distribution to board support, stencil design, reflow profiling, and final inspection.

Learn more
Technical Insight

What Makes Manufacturing Ultra-Thin PCBs Truly Challenging? The Interlinked Impact of Lamination, Handling, and SMT

Achieving target thickness in ultra-thin PCBs is only the first step; mass production demands solutions for lamination warpage, pattern misalignment, handling damage, solder paste printing, and reflow support. This article breaks down how thin-board challenges cascade across the manufacturing flow—and what capabilities customers should verify when selecting an ultra-thin PCB supplier.

Learn more