Automotive FPC manufacturer

Built to bend. Forever.

Hongyi Precision Circuit delivers turnkey FPC / FPCA manufacturing — from automotive column switches to humanoid robot hands — across single-sided, double-sided, multilayer and rigid-flex builds. Controlled end to end under IATF 16949, with samples in 3-4 days and volume delivery in 7-8 days.

Column-switch FPC
Sensor flex circuits
Dexterous-hand FPCA
Actuator flex
Wiper-system flex
Column-switch FPC
Sensor flex circuits
Dexterous-hand FPCA
Actuator flex
Wiper-system flex
Zhang的头像
Their stalk switch flex cleared a million bend cycles with no breaks — two years in production, not one bad batch.
Zhang · EV maker · Interior electronics

3-4days

Sample lead time

7-8days

Production lead time

10yrs+

Engineering experience

15million pcs

Monthly flexible circuit capacity

Bright cleanroom with automated production lines

Who we are

A flex circuit partner you can build on

We serve automotive electronics, sensors, actuators, AI vision interconnect and robotic dexterous hands. Backed by automotive-grade quality management, an experienced engineering team, a stable supply chain and full-process validation, we deliver highly reliable, consistent and fully traceable flexible circuit solutions.

  • Automotive-grade quality

    Certified to IATF 16949, ISO 9001 and ISO 14001, serving automotive and consumer electronics customers.

  • Turnkey FPCA

    From flex fabrication through to assembly in one place, reducing hand-offs and supply chain risk.

  • Greater Bay Area supply chain

    Based in Chang’an, Dongguan, leveraging a mature electronics cluster for cost-effective, dependable supply.

Learn more

Why Hongyi

Automotive-grade reliability, at production volume

To meet automotive and humanoid robotics demands, we invest continuously in quality, delivery and validation.

Certified quality

Certified to ISO 9001:2015, ISO 14001:2015 and IATF 16949:2016, allowing us to serve the differing needs of automotive and consumer electronics customers worldwide.

Fast turnaround

Samples in 3-4 days to shorten your development cycle, and volume delivery in 7-8 days as part of a turnkey FPCA service.

Experienced engineers

Our R&D team brings together engineers with more than ten years in flexible circuits, offering cost-effective solutions across varied products and quality targets.

Manufacturer-direct pricing

Drawing on the Greater Bay Area electronics cluster, we manage cost across the whole chain to offer excellent value without compromising automotive FPC quality.

One-on-one support

One-to-one fault diagnosis, technical guidance and matched solutions, with responsive after-sales handling that minimises production losses.

Reliability testing

We focus on performance, temperature endurance, flex life and conductive stability, controlling quality from incoming inspection and sample testing through to finished-product ageing trials.

Quality

Tested at every stage, from incoming material to shipment

We run full-process validation against demanding criteria for automotive flexible circuits, covering performance, temperature endurance, flex life and conductive stability.

100%
E-test coverage
3
Certifications
AOI
Automated optical inspection
24h
Response time
Learn more
Test equipment and engineers in the reliability laboratory

How we work

From enquiry to production in five steps

A standardised project rhythm that keeps both the sample and production phases predictable.

  1. STEP 1

    Drawing review

    We take in your Gerber files and specification, then return a manufacturability analysis and process recommendations.

  2. STEP 2

    Stack-up sign-off

    We jointly confirm stack-up, materials, stiffeners and bend-area design to remove volume production risk.

  3. STEP 3

    Engineering samples

    Samples delivered in 3-4 days, accompanied by a first article inspection report.

  4. STEP 4

    Pilot run validation

    Temperature, flex life and conductive stability validation to confirm line capability.

  5. STEP 5

    Volume delivery

    Volume delivery in 7-8 days, with ongoing yield tracking and technical after-sales support.

Send us your drawings

Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.

  • Manufacturability analysis and stack-up advice
  • Samples in 3-4 days, volume in 7-8 days
  • Quality managed to IATF 16949
  • Turnkey FPC through to FPCA assembly