Seat Pressure Sensor FPC

Hongyi Precision maintains a mature automotive-grade FPC mass production system. All smart cockpit FPC products undergo one million flex cycle testing, thermal cycling testing, vibration reliability testing, salt spray resistance testing, 100% electrical continuity testing, and full-process traceability—enabling Hongyi to deliver stable, high-quality volume supply services to OEMs and automotive electronics suppliers.

Seat Pressure Sensor FPC

Key features

Mature Design

Optional shielding layer for electromagnetic interference (EMI) suppression, reducing touch drift and false touches;

Reliable Quality

Excellent temperature and humidity resistance, plus superior flex life;

Compact Layout

Ultra-thin flexible PI substrate enabling irregular routing and conformal mounting on curved surfaces;

Stable Signal Transmission

Precision fine-pitch traces with controlled impedance to ensure touch signal integrity;

Specifications

Layers
1 – 2 layers
Minimum Line Width/Spacing
50 / 50 µm
Base Material
PI 25 / 50 µm
Copper Thickness
35 / 18 µm
Stiffener Options
PI / stainless steel stiffener
Outline Tolerance
± 0.10 mm
Operating Temperature
-40℃ ~ 105℃

Typical applications

  • Seat Adjustment Mechanism
  • Mirror Folding Actuator
  • Air Vent Actuator
  • Door Lock & Tailgate Actuator

Talk to an engineer

Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.

Quote Now