Products

A full range of automotive and robotics FPC

Custom FPC / FPCA for automotive switches, sensors and humanoid robot hands.

Browse products by application

Central Control Display Touch Module FPC

Smart Cockpit FPC

Central Control Display Touch Module FPC

The Central Control Display Touch Module FPC is used in smart cockpit in-vehicle display systems, featuring rolled annealed copper foil and automotive-grade conformal coating; supports one million dynamic flex cycles and operates across a wide temperature range of -40°C to 125°C, meeting assembly requirements for irregular shapes and narrow-bezel large displays.

View details
Automotive Display FPC

Smart Cockpit FPC

Automotive Display FPC

Automotive Display FPC is specifically designed for smart cockpit display systems, manufactured to AEC-Q200 standards, and engineered to resist bending-induced cracking, trace oxidation, and solder joint lifting.

View details
FPC for Module Touch Interaction Components

FPC for Intelligent Cockpit

FPC for Module Touch Interaction Components

FPC for Module Touch Interaction Components is specifically designed for automotive central control displays, instrument clusters, interior ambient lighting, and gear shifters—core intelligent cockpit components—with automotive-grade design for high durability and stability, supporting lightweight construction, curved layout, and high-definition signal transmission.

View details
Central Control and Instrument Display FPC

Smart Cockpit FPC

Central Control and Instrument Display FPC

Central control and instrument display FPC enables signal transmission between smart cockpit central units and instrument clusters, supporting single-layer, multi-layer, and custom-shaped cut structures to meet OEM cockpit structural design and assembly stroke requirements.

View details
Seat Pressure Sensor FPC

Smart Cockpit FPC

Seat Pressure Sensor FPC

The seat pressure sensor FPC is used in smart cockpit systems to monitor occupant posture and pressure distribution in real time. It features an automotive-grade flexible printed circuit structure validated through one million flex cycles, thermal cycling (high/low temperature), vibration, and salt spray testing—ensuring high reliability and full traceability.

View details

Send us your drawings

Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.

Quote Now