Products
A full range of automotive and robotics FPC
Custom FPC / FPCA for automotive switches, sensors and humanoid robot hands.
Browse products by application
5 products

Consumer Electronics FPC
Smart Lock Keypad FPC
Smart lock keypad FPC for touch-key signal transmission in smart locks; features flexible substrate and precision circuitry to meet panel space constraints and bending installation requirements.
View details
Consumer-Grade FPC
Smart Wearable Mainboard FPC
Smart wearable mainboard FPC is a consumer-grade flexible printed circuit, suitable for miniaturized and irregularly shaped electronics such as smart wearables, Bluetooth earphones, and tablets, featuring ultra-thin construction, bendability, and 3D conformal mounting.
View details
Consumer Electronics FPC
LED Phototherapy Facial Mask FPC
LED phototherapy facial mask FPC for sensor interconnection in flexible LED light therapy masks; uses rolled annealed copper substrate and LDI precision imaging to ensure uniform multi-channel LED current and consistent luminance; supports 3D curved surface conformability, repeated bending, and ENIG pads compatible with SMT reflow soldering.
View details
Consumer Electronics FPC
Tactile Switch FPC
Tactile Switch FPC belongs to the sensor interconnection category of flexible printed circuits, specifically designed for touch-key signal transmission in consumer electronics—suitable for wearables, audio devices, smart home products, and touch modules; customized per end-product bending frequency and assembly method.
View details
Consumer Electronics FPC
Custom 0.15/0.2mm Ultra-Thin FR4 PCB
Ultra-thin 0.15mm/0.2mm FR4 rigid PCBs engineered specifically for consumer electronics FPC applications, manufactured on dedicated thin-board production lines to resolve lamination warpage challenges; supports high-Tg substrates and IATF 16949 automotive qualification, suitable for automotive electronics and intelligent modules.
View detailsSend us your drawings
Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.