Products
A full range of automotive and robotics FPC
Custom FPC / FPCA for automotive switches, sensors and humanoid robot hands.
Browse products by application
6 products

Electronic gear shifter, shift-selector FPC
Electronic Gear Shifter FPC
Integrated automotive electronic gear shifter FPC with built-in conductive ring, designed for gear-position angle signal acquisition.
View details
Automotive Switch Interconnection
Automotive Column-Mounted Shifter FPC
Automotive shifter flexible circuit board with high-temperature-resistant PI coverlay, balancing flexural durability and tensile strength.
View details
Sensor Interconnection
Electronic Shift Sensor FPC
Automotive electronic shift position sensing FPC, with optimized trace routing in bending zones to eliminate stress concentration points and significantly extend repeated flex life.
View details
Sensor Connection
Electronic Shifter FPC
Flexible Printed Circuit for automotive electronic shifter mechanisms, featuring dynamic/static bend zone control to manage bend radius and prevent copper foil fatigue fracture, suitable for long-term reciprocating rotational applications.
View details
Sensor Interconnection
Wiper Control Switch FPC
Wiper Control Switch FPC: CAN/LIN differential signal traces follow equal-length, equal-spacing, parallel routing guidelines to maintain continuous impedance and ensure stable in-vehicle bus signal transmission.
View details
Sensor interconnection
Electronic gear shifter rolled copper FPC
Automotive electronic gear shifter sensor flexible circuit board; high-elongation rolled annealed (RA) copper foil is used in dynamic flex zones to withstand millions of reciprocating bends, solving long-term cracking and open-circuit failures.
View detailsSend us your drawings
Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.