Products
A full range of automotive and robotics FPC
Custom FPC / FPCA for automotive switches, sensors and humanoid robot hands.
Browse products by application
5 products

Bipedal Robot
Bipedal Robot Joint Sensor FPC
Bipedal robot joint flexible printed circuit (FPC), with zone-specific surface finishes: ENIG for functional pads and tin plating for general traces. ENIG pads enhance salt mist resistance and oxidation resistance, balancing long-term operational reliability and manufacturing cost.
View details
Humanoid Robot
Humanoid Robot Rigid-Flex FPC
Humanoid robot rigid-flex FPC: precisely designed mounting holes and alignment features in static areas ensure reliable assembly positioning and resistance to long-term vibration, preventing FPC misalignment and stress-induced aging.
View details
Bipedal Robot
Bipedal Robot Camera Module FPC
Flexible Printed Circuit for bipedal robot vision cameras: Early-stage DFM design strictly aligns with production process limits; standardized solder mask openings and via spacing parameters effectively reduce process defects and ensure stable high-volume delivery.
View details
Humanoid robotics
Dexterous hand sensing FPC
High-density tactile sensing flex that determines the feel and service life of a dexterous hand.
View details
Humanoid Robot FPC
Cup Motor FPC
Precision flexible interconnects for cup motors and joint actuators.
View detailsSend us your drawings
Share your Gerber files or specification and our engineering team will assess manufacturability, advise on process and stack-up, then move your project through sampling and volume production to automotive standards.