News
Industry developments and technical notes
We follow technical and market developments in automotive FPC and flexible circuits for humanoid robotics, and we welcome the conversation.
Focus areas
FPC replacing automotive harnesses
With light weight, high flex endurance and dense integration, FPC is replacing conventional harnesses across smart cockpits and body control.
Flexible circuits for humanoid robots
A single humanoid robot uses 40-70 flexible circuits, with demand growing quickly for joint drives, tactile dexterous hands and vision modules.
Automotive process and quality
We keep refining our process window and full-flow validation around demanding temperature, flex life and conductive stability criteria.
Company news
Technology InsightsTechnology-Driven Cost Reduction: Hongyi Precision Avoids Cost-Cutting Through Feature Reduction—Instead, It Achieves Mutual Relief for Supply and Demand via Process Innovation
Hongyi Precision formed a cross-departmental cost optimization task force, conducting a four-month process review of its robotics and automotive FPC product lin…
Read more
Technology InsightsDelivery Efficiency System Transformation: Hongyi Precision Team’s Dedication Pays Off
Hongyi Precision formed a 9-member delivery optimization team to reengineer processes targeting three key delay points—drawing review, material procurement, and…
Read more
Technology InsightsPushing Reliability to the Limit: Hongyi Precision Forms Special Task Force to Rebuild End-to-End Quality System for Automotive & Robotics FPCs
Hongyi Precision has formed a dedicated task force to address poor batch-to-batch consistency in automotive and robotics FPC production, conducting 147 comparat…
Read more
Industry insightHumanoid robot FPC demand surges as the supply chain accelerates
Industrial delivery of humanoid robots has picked up pace recently, driving rapid growth in the market for dedicated high-reliability FPC. A single humanoid rob…
Read more
Technical noteFive design essentials for humanoid dexterous hand FPC
As humanoid robots reach volume production, the five-finger dexterous hand has become a core interaction component, and its internal high-density tactile sensin…
Read more
Industry insightAutomotive FPC penetrates core vehicle components
As vehicle electrification and intelligence continue to accelerate, flexible printed circuits are replacing conventional wiring harnesses across EV powertrain,…
Read more
Technical noteClear advantages as electronic shifters move to FPC
With electric vehicles and smart cockpits becoming mainstream, column switches and electronic shifters are replacing mechanical gear levers, and the internal dy…
Read more